Low Graphics Version Home | Contact Us | FAQs | Service Request | eLists | Site Map
City of Fullerton
Engineering
Home ... > Projects in Design > Water
Shortcuts
Downtown
Water Bill Payment
Agendas & Minutes
City Employment
City Services
Classes
Emergency Preparedness
Online Services
Permits
Police
Public Notices
Water Project in Design

The Water Main Replacement program is part of our continuing efforts to repair deteriorated infrastructure and to provide a safe and reliable source of water for our citizens. The City replaces 1.5 miles of pipline each fiscal year. The locations are determined from a list that is compiled by the Engineering and Maintenance Services departments. Besides the water main replacement program, the City rehabilitates other infrastructure such as reservoirs and pump stations on an as needed basis.

Water Main Replacement Criteria:

  • Water main break history
  • Water main material
  • Water main age
  • Undersized water main

Water Projects in Design:

  • Water Main Replacement 2011-2012:

Location Estimated Construction Date
None at this time

FacebookTwitterYouTube
RSS for Fullerton NewsFullerton eLists
Home | Contact Us | FAQs | Service Request | eLists | Site Map | Disclaimer & Privacy PolicyCopyright © 2000 - 2012 City of Fullerton. Engineering, 303 W. Commonwealth, Fullerton, CA 92832. (714) 738-6845