|  |  | Laguna Lake Park Improvements
This contract was awarded to Micon Construction Inc. for $299,617.82.
The work shall consist of, but not limited to, excavation and grading of multi-use trail; installation of timber guard rail, wooden foot bridge, wooden trail sign; relocation of hitching post and of large boulders; reconstruction of concrete driveway, concrete curb and gutter, and concrete curb drain; installation of irrigation system; planting trees and shrubs; installing trash receptacles and picnic tables. It is scheduled to be complete in January of 2013.
|