For pothole problems, please contact our Maintenance Services Department at 714-738-6897.

The City usually contracts out three to four arterial street rehabilitation projects in each fiscal year and two to three phases of the residential street rehabilitation projects.

Notices of impending work are distributed to affected residents and business owners approximately three months in advance for arterial streets and two days in advance for residential streets.

ARTERIAL STREET RECONSTRUCTION - IN DESIGN

Street Limits/Location Estimated Construction Date
Berkeley Harbor to Lemon Summer 2013
Magnolia Ave Orangethorpe Ave to Ash Ave Summer 2013

ARTERIAL STREETS SCHEDULED FOR WIDENING - IN DESIGN

Street Limits/Location Estimated Construction Date
Bastanchury Road Harbor to Fairway Isles April 2014

GRADE SEPARATION - DESIGN IN PROGRESS

Street Limits/Location Estimated Construction Date
Placentia Ave Underpass Crowther to Santa Clara April 2011
Raymond Ave Underpass Ash to Sante Fe October 2013
State College Blvd Underpass Kimberly to Sante Fe October 2013

Raymond Ave Project Summary pdf
Raymond Ave Project Report pdf - large file
Raymond Ave Project Report Addendum pdf

State College Blvd Public Briefing pdf
State College Blvd Preliminary Environmental Study pdf - large file
State College Blvd environmental technical studies are available at the City Engineering counter.

The City maintains a 5 year street rehabilitation plan for paving and reconstructing arterial streets. The plan is generated with the aid of a sophisticated Pavement Management System developed by the Metropolitan Transportation Commission. The street repair policy contains the basic criteria for developing the plan and includes the following:

  • Street condition
  • Type of repair required
  • Cost effectiveness
  • Amount and type of traffic
  • Bus or bicycle route
  • Coordination with other City programs, e.g., sanitary sewer or storm drain construction

RESIDENTIAL STREET RECONSTRUCTION

Note: All streets may not be constructed due to funding limitations.

Street Limits/Location Estimated Construction Date
Coronado Dr, La Entrada Pl, Barcelona Cir, Cabrillo Cir Mirador Cir, Alvarado Cir, Capistrano Cir, Madonna Dr On hold
Ponderosa Evergreen to Lark Ellen, Sequoia/Sandalwood Rolling Hills to Lime On hold
Basque Amerige to Malvern Fall 2013

Residential street reconstruction is currently done in conjunction with sewer replacement projects. Streets that have been scheduled for sewer replacement will also be evaluated for street reconstruction or rehabilitation. See the Sewer Section for a list of sewer reconstruction projects in design.

Information on the location of street projects currently under construction, recently awarded construction projects that will start in the near future, and projects being advertised for bid may be obtained by calling the Engineering Department at (714) 738-6845.